CAW Meeting Report – July 2016

We had a very busy agenda!  Apologies for the long list of minutes and no doubt not all of the discussion was captured.  In future we will probably change these meetings to become more action-focused workshops and less of a ‘talk fest’.  So watch this space.

 Updates on initiatives, future activities

    • CBD network plan
      • Some good ideas from WCC
      • Looking at setting up scenarios

      • Feeding the ideas into Getting Wellington Moving

      • Will take a while to happen, although some things can happen sooner particular where it is not part of the bigger transport changes.

      • There is a good picture of what is most needed.

      • NZTA also interested in quick wins for the CBD.  Needs to be pragmatic and sensible.  Similar to some of the recent improvements in Auckland [e.g. allowing cyclists to go both ways on some CBD one-way streets].

      • Doesn’t need big projects.  Can be slower speeds to create better shared spaces, e.g. in Cuba Street

    • Temporary closure of Waterloo Quay
      • WCC has been asked to monitor impact of roadworks on the traffic
      • Can be used as evidence to show that taking part of the road for a cycleway does not in fact impact on traffic
      • WCC said they would look into this
    • Reset of UCP
      • NZTA and WCC working together on the reset of the UCP plan
      • Should not mean that everything stops
      • But may reprioritise some of the routes such as Island Bay to CBD; creating better connections
    • Easter Bay Routes submission
      • Key message was not to focus on big projects alone; small changes will make a big difference too
      • This can be a network quieter neighbourhood street, as well as safer crossing like at the sports stadium
      • Not clear what is next and what timeframes, and action to confirm this at the next meeting
      • Note that UCP money would need to be spend by 2018
    • Rebicycle – Hilleke
      • A great initiative to make bikes, helmets, training etc available in the communities; making cycling more accessible for people on lower incomes, e.g. refugees
      • Needs to be made available in the communities itself
      • People / organisations can donate old or new bikes.  Can be dropped off at the Sustainability Trust building in Forrester Lane < not just yet – working on it!
      • Working with other parties like Mechanical Tempest, Pedal Ready, local bikeshops
      • Great opportunity for CAW to support this and show that it is a community organisation
    • Hutt road improvements – update on CAW survey from Alastair
      • Results submitted to WCC
      • WCC have boosted parking enforcement
      • A couple of different surveys have been done recently over a number of days to observe driver behaviour at driveways and also ask people about their purpose for parking along the shared path and journeys
    • Committee planning day
      • Focus was on updating the vision and objectives statements [where we want to be]
      • Further workshop to be hold to look at the mission, strategy & tactics statements [how we will get there]
    • Go By Bike Day
      • Concern that we have not heard from WCC
      • Time is running out to get the organisation moved to WCC
      • Recommendation that CAW organise the next event but in partnership with WCC
    • Local body elections – lobbying webinar from Alastair
      • Webinar run to talk about how to lobby candidates as part of the local body elections
      • Key points were to research the person you’re meeting with, meet with a small group, don’t lecture, focus on the positive, concentrate on issues not personalities

Island Bay Cycle Way

    • Working together with the Island Bay Residents Association (IBRA)
      • Ron had a very productive get together with Vicky & Jane of the IBRA, facilitated by Justin Lester and Paul Eagle.  We agreed to more collaboratively together and get away from the polarised views
    • Update on IBRA meeting
      • Ron was invited to the June meeting
      • It was good to hear the views from locals and also to hear David Chick from the WCC acknowledge that they got it wrong and about the opportunity to re-consult.  He faced some tough questions though.
    • Recap of the audit reports
      • The report focused on the construction (and not the design) of the cycleway
      • The report noted some moderate & minor improvements such as improving visibility at driveways by removing car parks, and better signs
      • The major concern was that the old road markings had not been removed
    • Our own observations / key messages
      • The overall design could have been done better to make it work as a shared space for walkers, cyclists, public transport and cars
      • Marking for car parks are not clear, particularly in the dark and wet.  
    • What happened at the Council committee meeting
      • We highlighted that the cycleway is already achieving what it set out to do; it has got people young and old cycling who would not have done so with the previous design
      • We urged the council to implement the recommendations made in the report and take some of these into consideration with for example avoiding car parks to close to driveways at the Hutt Road
      • In response to a question about cyclists still using the road, Ron explained that faster cyclists typically do not use a cycle way because it slows them down too much, and that the cycle way is designed and targeted for less confident cyclists
      • The Council agreed to start re-consultation with the Island Bay community asap, but the review will still take place early next year
    • What’s next – review & consultation
      • IBRA and CAW are meeting with the WCC to discuss how to ensure a community led consultation
      • Suggestion that we can do a workshop to get ideas of how to get the right community engagement / representation

Committee items (10-15 mins)

  • Updates from regular and other stakeholder meetings
    • Ron / Timon / Patrick meeting with Dougal from the NZTA
      • CAW/CAN provided very positive feedback on the OPUS consultant (Jessica) that NZTA have used for engaging with us on cycling / transport projects
      • We discussed the opportunity to do some quick / non-controversial cycling improvements in the CBD
      • Recommendation that NZTA get involved in the Hutt City Council cycling steering committee
    • Ron / Patrick / Timon participation in local government authority workshop
      • Had a variety of stakeholders provide input in how the LGA could better assist with transport choices & projects
    • Patrick / James / Ron / Timon meeting with Jessica from NZTA
      • Focused on the early prototype implementation of a cycleway connecting the slipway just north of the Ngauranga interchange to the Hutt Road just past the underbridge (going south)
      • Will be 5 metres wide except for under the bridge where it will be 3 metres
  • Upcoming submissions
    • Open spaces 
      • Main issues are definition of e-bike
      • Possible commuting routes in areas designated to be closed to bikes
      • Further info available on the CAW website
    • Airport runway extension 
      • Chance to talk about concerns how large number of trucks shifting fill for the extension will impact on cyclists, but also opportunity to factor cycling into the design
  • Promoting CAW – logo, name change
    • Hilleke has come up with a fantastic logo and there has been various ideas about changing the name as we have moved on from “Aware”.  Could be simply “Cycling Wellington”
    • Committee will agree and we can then use this to create a flyer and business cards

Rants & Raves (5 mins)

  • Rant about vegetation blocking the path around the bays; needs to be cut back properly, not just a bit of a trim.
  • Rave about Gill Penalosa’s talk about sustainable urban Development and how it spoke very much about the things that are dear to all of our hearts in creating better shared spaces.  A big pad on the back for ourselves that we advocate and help to bring about these changes.